2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security», Rome (Italy). 02-04 November 2017
Summary:
Italy is currently finalising the design of its capacity remuneration mechanism. The provisional capacity payment, introduced in 2004, is to be replaced by a market-wide reliability option scheme. This paper provides an in-depth description of the Italian mechanism and presents a critical analysis of its design.
Keywords: Capacity Remuneration Mechanisms; Reliability options; Resource adequacy; Flexibility; Design elements; Italy
Publication date: 02-Nov-2017.
Citation:
P. Mastropietro, F. Fontini, P. Rodilla, C. Batlle, "Critical analysis of the «new» Italian capacity remuneration mechanism", presented at 2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security», Rome, Italy, 02-04 November 2017